Lifting of bowl assembly only about the Vertical Turbine Pump

Source: China Vertical Turbine Pump Manufacturer Date:2024/11/20 22:02:02 visitors:Classificationvertical turbine pump

Lifting of bowl assembly only about the Vertical Turbine Pump

Carefully lift the bowl assembly to vertical with clamp and straps. See below.

When installing a long 6” or 8” bowl assembly, leave the bowl assembly securely fastened to the wooden skid that is attached for shipping until the bowl assembly is raised to vertical position.

Do not allow the weight of the bowl assembly to rest on the bell lip.

Lifting of bowl assembly only about the Vertical Turbine Pump.jpg

Previous page:Leveling of Canned Vertical Turbine Pumps with the suction barrel (also referred as Canned VTP Pumps)
Next page:Lifting of cast discharge heads for Vertical Turbine Pumps

Leading Products

Mobile phone Scan to add WeChat

008613974960765